Alberox, Inc.
Turnkey services to retrofit the existing HVAC System.
Engineering, Design and Installation Services to
retrofit the outdated HVAC System for the Pro-form and Medical X-Ray Areas.
Allied Tube & Conduit Electrical Products (Division
of TYCO International)
Engineering Evaluation Of Production Emissions And Current Pollution Control Systems
Design/Built
Project: Phase I of Harvey Plant Ventilation Improvements
Commonwealth Resource Management Corporation
Engineering, Design,
Procurement & Construction Services for Leachate Evaporation System at North Country Environmental Services, Inc.,
Jabil Circuits, Inc
Engineering and Re-design of the existing HVAC and Exhaust Systems for DODs Production Area.
Retrofit of the existing HVAC and Exhaust Systems. Engineering, Design, Programming and Installation of Alerton EMS for the DODs
Production Area and new Office Space Area.
MassMutual Financial Group
Miscellaneous Energy Conservation Studies.
Engineering
Study of the HVAC System, serving
Engineering Study of Main Chiller Plant with aggregative cooling capacity of
4,750 ton
North Safety Products, Inc
Engineering Study of the HVAC System, serving Medical Assembly Area at North Safety
Products, Inc
Design/Built Project to perform installation Mechanical, Electrical, Control and Wall Systems for Class 10,000
Cleanroom for Attest Assembly Area
Turnkey Services for Engineering, Design and Installation of HVAC
and Direct Digital Control Systems for
SmartPak Equine, Inc.
Turnkey Services for Engineering, Design
and Installation of HVAC and Direct Digital Control Systems for Office and Production Area.
Turnkey Services for Engineering,
Design and Installation of HVAC and Direct Digital Control Systems for 60,000 sq.ft expansion of Office and Production Areas.
TPI Composites,
Inc.
Engineering and Design of Curing Convectional Oven for Fiberglas Automobile Hoods Fabrication
Engineering and
Design of Heating System for Shear Web Molds for 40 and 50 meters long Wind blades.
Sanmina-SCI Corporation (
Mechanical Engineering, Design & Installation of Mechanical equipment for the Coating Room Project (5,000 sq. ft of Class 10,000
Cleanroom)
Mechanical Engineering, Design & Installation of Mechanical equipment for the Inner Layer Room Expansion Project
(7,500 sq. of Class 10,000 Cleanroom)
Mechanical Engineering, Design & Installation of Mechanical equipment for the Laser
Drill Project. (2,500 sq. ft of Class 100,000 Cleanroom)
Datel Inc. /Murata Power Solutions, Inc (
Mechanical
Engineering, Design & Installation of Mechanical equipment for SMT Laser and Hybrid Assembly Room (2,300 sq. ft of Class 10,000
Cleanroom)
North Safety Products, Inc (
Design/Built Project to perform installation Mechanical, Electrical, Control
and Wall Systems for Class 10,000 Cleanroom for Attest Assembly Area