As a leader in professional and industrial adhesives and sealants, ITW TACC redefines the role of manufacturer.
Their products provide productivity, regulatory and environmental solutions for the woodworking/HPL,
building construction, roofing, HVAC, manufactured housing/RV, masonry, landscaping, transportation
and marine industries.
Baker Engineering & Controls provided:
· Engineering, Design, Fabrication and Installation of Exhaust and Make-up Air Systems for Churn and Versa
Rooms
· Engineering, Design, Fabrication and Installation of Exhaust , Make-up Air and Humidification Systems
for Clay Mix Room
· Design/Built Project to perform installation of two (2) fire tube steam boilers, constructed for 150 psig steam
pressure and all necessary
auxiliary equipment, including:
· Feed Water Pumps.
· Packed Column type Deaerator,
· Blowdown Separator.
· Automatic twin cation resin softening system
· All necessary steam, natural gas and city
water piping and fittings.
· Turnkey Services for Engineering, Design and Installation of Make-up & Exhaust Air Systems in Churn Room,
Flamm Room, and Versa Mix Room
· Design/Build Services for installation of Process Cooling System with aggregate cooling capacity of 150 tons.